PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at Bathrooms 133-136 Facing North.jpg Block work at Intake Room Facing West.jpg Connecting copper piping at the 2nd floor VAV boxes Facing West.jpg Split wire above the ceiling at the 3rd floor Facing East.jpg Started laying out block at Stair -3 Facing North.jpg Installing Elev. 1,2,3 guide rails at the 4th floor Facing South.jpg Installing Emergency Night lighting split wire at the 3rd floor Facing East.jpg Installing exterior framing at the 4th floor Facing North.jpg Installing sprinkler branches at the 4th floor Facing West.jpg
Previous pageNext page Started laying out block at Stair -3 Facing North
Started laying out block at Stair -3 Facing North